November 20, 2026

FILOform introduces WallMax to the UK market

placeholder

FILOform is proud to announce the UK launch of WallMax, a next-generation mechanical sealing system designed to protect critical infrastructure against ingress. Already trusted across Europe and Asia, WallMax is now available in the UK for the first time.

 

At the heart of WallMax’s innovation is its multi-layer, colour-coded module system. This design offers installers a faster, more precise sealing solution that allows for the quick identification of cable diameters. By peeling back layers via WallMax’s visual colour-marked system, installers can size, select and seal cable and pipe entry points without guesswork.

Finn McCrory, Product Manager at FILOform, comments:

“We’re excited to bring a solution to the UK market that combines engineering precision with installer-friendly features. WallMax represents a real step forward in improving compliance, consistency and speed compared to traditional sealing methods.”

 

Designed for a wide range of applications — including rail, energy, water, telecoms, construction, and data centres — WallMax provides a dependable barrier against environmental ingress at cable and pipe entries. Its modular design supports any number of combinations and customisations, with frames and modules that can be mounted, modified, reconfigured, and expanded to suit changeable site requirements.

Finn adds:

“Here in the UK, WallMax is only available through FILOform’s national distribution network. This means the product is backed by FILOform’s expert technical sealing support and turnkey service. As well as the product’s in-built precision engineering, this technical backing ensures specifiers and contractors have access to design advice, training, and installation guidance from start to seal.”

WallMax is available now from FILOform and can be shipped to project sites immediately. For more information, visit: https://www.filoform.co.uk/wallmax